Skip to content Skip to left sidebar Skip to right sidebar Skip to footer

UPDATE: UNEXPECTED POWER OUTAGES IN PARTS OF DENNEOORD, TWEERIVIEREN AND LEVALLIA

UPDATE: UNEXPECTED POWER OUTAGES IN PARTS OF DENNEOORD, TWEERIVIEREN AND LEVALLIA

The ERT to restore power supply in parts of Denneoord and Tweerivieren and Levallia is 19:00. This ETR includes the 30-minute rotational switching on and a wait of about 30 minutes after load shedding since George’s load shedding ends at 18:30.

Issued by George Municipality
17 April 2023 @15:35