Skip to content Skip to left sidebar Skip to right sidebar Skip to footer

REPAIRS TO ROAD SLIP FAILURES ALONG WHITES ROAD, WILDERNESS

IMPORTANT – TAKE NOTE‼️
Wilderness, Whites Road CLOSED 2 September – 4 October 2024

*********************************************************************
The repairs to road slip failures will have an impact on residents, pedestrians, runners, cyclists and road users. Construction commenced in August 2024. The estimated construction duration is 2 months.

DESCRIPTION:
The purpose of this Contract is to repair two road slip failures along Whites Road, Wilderness.

The works involve the installation of retaining structures and repairs to the roadway and drainage system

PROJECT PERIOD:
• PHASE 1: 5 – 30 AUGUST 2024 (COMPLETED)
• PHASE 2: 02 SEPTEMBER 2024 TILL 04 OCTOBER 2024 (FULL ROAD CLOSURE)

SERVICE DISRUPTION:
No Municipal services will be affected. Road lane closures will be implemented along the affected areas.

The Contractor will liaise with affected residents in advance, to arrange local access where and when required.

WORKING HOURS:
Working hours will be from 07h00 to 18h00 Mondays to Fridays, and potentially from 07h00 to 14h00 on Saturdays.

IMPACT:
The construction area will be fully closed to the public. No pedestrians, runners or cyclists may access the construction area throughout the duration of the construction period. Flag persons and temporary road signage must be always adhered to.

ACCESS TO SITE:
Access to the construction site will be strictly controlled. No member of the public will be allowed access to the construction area, in terms of the Occupational Health and Safety Act.

PROJECT ENQUIRIES:
Urhwebo Transand: Mr Lemar Meyer– 083 397 7687

The George Municipality apologises for any inconvenience and appeals to the public to be patient and exercise caution throughout the construction period.

Please look out for all temporary road signage and construction personnel.