PUBLIC NOTICE: Emergency Municipal Loadshedding Relief Grant November 2023 Update

The Western Cape Provincial government has authorized a sum total of R88.185 million rand from the Provincial Unforeseen and Unavoidable Reserve Fund to assist municipalities with the unforeseen and immediate impact of prolonged load-shedding on water and wastewater services.

In terms of this allocated Funding, George Municipality has received the sum of R14 220 000 (VAT included) as a contribution toward the purchase and installation of back-up energy supply. This back-up supply can include generators, renewable power sources, batteries and all ancillary costs associated with the installation thereof for example,  switch gear, safe keeping, caging etc. for water and wastewater infrastructure.

This grant funding will assist the George Municipality in ensuring a healthy environment and to continue with the provision of basic services to our citizens and businesses during the current load-shedding.

The municipality is in process of purchasing emergency diesel generators that will be placed strategically as follows:

Water Treatment Works

Haarlem WTW  (+_ 150kVA diesel generator)
Uniondale WTW (+- 200kVA diesel generator)

Waste Water Treatment Works
Uniondale WWTW (+_ 200 kVA diesel generator)
Kleinkrantz WWTW (+_ 300 kVA diesel generator)
Outeniqua WWTW (+_ 1000 kVA diesel generator)

Progress to Date:
Procurement Phase:   Appointment of Consultant ( Complete ) – 100%
Appointment of Contractor: Haarlem WTW ( Complete ) – 100%
Uniondale WTW ( Complete ) – 100%
Uniondale WWTW ( Complete ) – 100%
Kleinkrantz WWTW ( Complete ) – 100%
Outeniqua WWTW ( Complete ) – 100%

Construction Phase:
Haarlem WTW ( ± 150 kVA diesel generator ) – 100%
Uniondale WTW ( ± 200 kVA diesel generator ) – 100%
Uniondale WWTW ( ± 200 kVA diesel generator ) – 100%
Kleinkrantz WWTW ( ± 300 kVA diesel generator ) – 100%
Outeniqua WWTW ( ± 1 000 kVA + 650 kVA diesel generator ) – 10%

In terms of the above the total expenditure to date for the project is therefore approximately 39,5% of the current funding allocation

Link to further information on how George Municipality is trying to mitigate the impact of load-shedding for George. https://www.george.gov.za/what-is-george-municipality-doing-to-alleviate-eskom-loadshedding-and-other-renewable-energy-projects/

 

PUBLIC OPEN DAYS AND COMMUNITY MEETINGS : ZONING SCHEME BY-LAW (OVERLAY ZONES) FOR UNIONDALE AND HAARLEM

Notice is hereby given that a public open day and a community meeting will be held at the following venues where the proposals on the abovementioned Overlay Zones will be presented and officials will be available to address any queries in this regard.

Haarlem Community Hall on Thursday, 7 December 2023
-Open day: 12h00-16h00
– Community meeting : 18h00-20h00

Enquiries in this regard can be directed to the Directorate: Human Settlements, Planning and Development at 044-801 9477.

C PETERSEN
SENIOR MANAGER : TOWNPLANNING
Civic Centre
York Street
GEORGE
6530

PUBLIEKE OPE-DAG EN GEMEENSKAPSVERGADERINGS : SONERINGSKEMA VERORDENING (OORLEG SONES) VIR UNIONDALE EN HAARLEM

Hiermee word kennis gegee dat’n publieke ope-dag en ’n gemeenskapsvergadering by die volgende plekke gehou sal word, waar die voorstelle op die bogenoemde Oorleg Sones aangebied sal word en amptenare beskikbaar sal wees om vrae in die verband te beantwoord.

1. Haarlem Gemeenskapsaal op Donderdag, 7 Desember 2023;
– Ope-dag : 12h00-16h00
– Gemeenskapsvergadering : 18h00-20h00

Navrae in die verband kan gerig word aan die Direktoraat: Menslike Nedersettings, Beplanning en Ontwikkeling by 044-801 9477.

C PETERSEN
SENIOR BESTUURDER : STADSBEPLANNING

Burgersentrum
Yorkstraat
GEORGE
6530

ESKOM LOADSHEDDING UPDATE – 3 December 2023

In order to manage emergency reserves, Stage 4 loadshedding will remain in force until 05:00 on Monday.   Thereafter, Stage 3 loadshedding will be implemented from 05:00 until 16:00, followed by Stage 4 loadshedding until 05:00 on Tuesday.  This pattern of Stage 3 loadshedding in the morning and Stage 4 loadshedding in the evening will be repeated daily until Friday 16:00. Eskom will communicate should any significant changes occur. Unplanned outages are at 12 648MW and planned maintenance is at 6 814MW of generation capacity.

 

George will be affected as follows:

Sunday 03/12/2023

22:00 – 00:30

 

Monday 04/12/2023

06:00 – 08:30

14:00 – 16:30

22:00 – 00:30

 

Tuesday 05/12/2023

04:00 – 06:30

12:00 – 14:30

20:00 – 22:30

 

Wednesday 06/12/2023

04:00 – 05:00

12:00 – 14:30

20:00 – 22:30

 

Thursday 07/12/2023

04:00 – 06:30

20:00 – 22:30

 

Friday 08/12/2023

04:00 – 06:30

12:00 – 14:30

20:00 – 22:30

 

Uniondale will be affected as follows:

Sunday 03/12/2023

17:00 – 19:30

 

Monday 04/12/2023

01:00 – 03:30

09:00 – 11:30

17:00 – 19:30

 

Tuesday 05/12/2023

07:00 – 09:30

15:00 – 17:30

23:00 – 01:30

 

Wednesday 06/12/2023

15:00 – 17:30

23:00 – 01:30

 

Thursday 07/12/2023

07:00 – 09:30

16:00 – 17:30

23:00 – 01:30

 

Friday 08/12/2023

07:00 – 09:30

15:00 – 17:30

23:00 – 01:30

 

Issued George Municipality on behalf of ESKOM

ESKOM LOADSHEDDING UPDATE – Saturday, 02 December 2023

Stage 4 loadshedding will be implemented at 20:00 tonight until 05:00 on Monday, in order to replenish the dam levels at the pumped storage power stations in preparation for the week ahead. Eskom will continue to monitor the power system closely, adjust and communicate the stages of loadshedding as required.

George will be affected as follows:
Saturday 02/12/2023
22:00 – 00:30

Sunday 03/12/2023
06:00 – 08:30
14:00 – 16:30
22:00 – 00:30

Monday 04/12/2023
06:00 – 08:30
14:00 – 16:30
22:00 – 00:30

Uniondale will be affected as follows:
Saturday 02/12/2023
17:00 – 19:30

Sunday 03/12/2023
01:00 – 03:30
09:00 – 11:30
17:00 – 19:30

Monday 04/12/2023
07:00 – 09:30
15:00 – 17:30
23:00 – 01:30

ROTATIONAL SWITCH ON AFTER LOADSHEDDING
Consumers are reminded to PLEASE use electricity sparingly after power returns. Please do not switch high-usage equipment on immediately after Load shedding.

Consumers are urged to turn off high-usage equipment and where possible to not switch on appliances such as stoves and kettles for at least 30 minutes after load shedding is scheduled to return. This will reduce the risk of overload tripping on the network.

Reporting power outages
Please do not phone the after-hours number or the Electrotechnical Department to report that you have no power immediately after load shedding is scheduled to be lifted. Please be aware of the rotational switching on i.e. areas are switched on one by one and not all at the same time to avoid overloading the system. Please wait at least 30 minutes before reporting no power. The Electrotechnical Directorate will be aware of a possible substation trip that needs to be sorted out.

Receive Eskom loadshedding notifications by downloading the free EskomSePush app from Google Play Store at https://sepush.co.za/

Issued by George Municipality on behalf of ESKOM

PUBLIC NOTICE – Breakdown at Kraaibosch Sewer Pump Station

Issued George Municipality, 1 December 2023

George Municipality wishes to inform residents in the Kraaibosch Area of a breakdown of the Sewer Pump station servicing the area. A contractor is currently on-site conducting repairs and suction trucks are managing to control the inflow, but we request the cooperation of these residents to minimize flow into the sewer network.

The estimated time to repair is 48 hours.

As indicated earlier this year, new pump sets to replace the existing pump set at the sewer pump station have been ordered. Due to arrive in October 2023, a shipping delay from abroad has moved the delivery period to January 2024.

We thank the public for their cooperation and patience in this regard, whilst we try to resolve this situation.

ESKOM LOADSHEDDING UPDATE:Thursday, 01 December 2023 @ 10:28

Due to the sustained improvement of the generation capacity with unplanned outages at 13 542MW, loadshedding will be reduced to Stage 2 from 10:00 today until 16:00.

Thereafter, Stage 3 loadshedding will be implemented from 16:00 until 05:00 on Sunday when loadshedding will be suspended from 05:00 until 16:00. On Sunday, Stage 3 loadshedding will resume from 16:00 until 05:00 on Monday. Eskom will communicate the update on the week ahead on Sunday afternoon.

George will be affected as follows:

Friday 01/12/2023
14:00 – 16:30
22:00 – 00:30

Saturday 02/12/2023
14:00 – 16:30
22:00 – 00:30

Sunday 03/12/2023
22:00 – 00:30

Uniondale will be affected as follows:

Friday 01/12/2023
17:00 – 19:30

Saturday 02/12/2023
01:00 – 03:30
17:00 – 19:30

Sunday 03/12/2023
01:00 – 03:30

ROTATIONAL SWITCH ON AFTER LOADSHEDDING
Consumers are reminded to PLEASE use electricity sparingly after power returns. Please do not switch high-usage equipment on immediately after Load shedding.

Consumers are urged to turn off high-usage equipment and where possible to not switch on appliances such as stoves and kettles for at least 30 minutes after load shedding is scheduled to return. This will reduce the risk of overload tripping on the network.

Reporting power outages
Please do not phone the after-hours number or the Electrotechnical Department to report that you have no power immediately after load shedding is scheduled to be lifted. Please be aware of the rotational switching on i.e. areas are switched on one by one and not all at the same time to avoid overloading the system. Please wait at least 30 minutes before reporting no power. The Electrotechnical Directorate will be aware of a possible substation trip that needs to be sorted out.

Receive Eskom loadshedding notifications by downloading the free EskomSePush app from Google Play Store at https://sepush.co.za/

ESKOM LOADSHEDDING UPDATE – Thursday, 30 November 2023 @ 19H30

 

Due to further improvement in generation capacity and emergency reserves, loadshedding will be reduced to Stage 4 from 20:00 (previously communicated Stage 5 loadshedding) until 05:00 on Friday. Thereafter, Stage 3 loadshedding will be implemented until 16:00. The schedule will continue to be implemented as previously communicated. Eskom will continue monitoring the power system closely, adjust and communicate the stages of loadsheding as required.

Loadshedding times for George remains unchanged
Friday 01/12/2023
06:00 – 08:30
14:00 – 16:30
22:00 – 00:30

Saturday 02/12/2023
00:00 – 02:30
14:00 – 16:30
22:00 – 00:30

Sunday 03/12/2023
22:00 – 00:30

Uniondale will be affected as follows:
Thursday 30/11/2023
19:00 – 21:00

Friday 01/12/2023
01:00 – 03:30
09:00 – 11:30
17:00 – 19:30

Saturday 02/12/2023
01:00 – 05:30 **
17:00 – 19:30

Sunday 03/12/2023
01:00 – 03:30

Issued on behalf of ESKOM by George Municipality

UPDATE ON ESKOM LOADSHEDDING – 30 November @ 15h45

Stage 3 loadshedding remains in force until 16:00 today. Thereafter, various stages of loadshedding will be implemented until Sunday

George will be affected as follows:
Thursday 30/11/2023
16:00 – 18:30

Friday 01/12/2023
06:00 – 08:30
14:00 – 16:30
22:00 – 00:30

Saturday 02/12/2023
00:00 – 02:30
14:00 – 16:30
22:00 – 00:30

Sunday 03/12/2023
22:00 – 00:30

Uniondale will be affected as follows:
Thursday 30/11/2023
19:00 – 23:30 **

Friday 01/12/2023
01:00 – 03:30
09:00 – 11:30
17:00 – 19:30

Saturday 02/12/2023
01:00 – 05:30 **

Issued George Municipality
17:00 – 19:30

Sunday 03/12/2023
01:00 – 03:30

Planned Power Outage – 4 December, George South

GEORGE SOUTH – PORTION OF YORK STREET, FICHAT STREET,BAMBOO STREET & INSIGNIS STREET
 
NOTICE is hereby given that the electricity supply will be interrupted on MONDAY 04 DECEMBER 2023 FROM 09H00 TO 12H00 for the purpose of doing alterations to the electrical mains. Consumers are warned to treat the installation as being live for the full duration as the supply may be resumed at any time within the notified period.
 
Should circumstances prevent the work being carried out during the abovementioned period; the work will be done on
TUESDAY 05 DECEMBER 2023 FROM 09H00 TO 12H00

Planned Interruption of the Electricity Supply: Portion of Thembalethu

PLANNED INTERRUPTION OF THE ELECTRICITY SUPPLY: PORTION OF THEMBALETHU

THE FOLLOWING AREAS WILL BE AFFECTED:
PORTION OF THEMBALETHU
HANSMOESKRAAL
SANDKRAAL LINE

NOTICE is hereby given that the electricity supply will be interrupted on MONDAY 04 DECEMBER 2023 FROM 09H00 TO 16H30 for the purpose of doing alterations to the electrical mains. Consumers are warned to treat the installation as being live for the full duration as the supply may be resumed at any time within the notified period.

Should circumstances prevent the work from being carried out during the abovementioned period; the work will be done on MONDAY 11 DECEMBER 2023 FROM 09H00 TO 16H30.