Skip to content Skip to left sidebar Skip to right sidebar Skip to footer

Notice Archive

PLANNED POWER OUTAGE: PORION OF WILDERNESS HEIGHTS

PLANNED POWER OUTAGE: PORION OF WILDERNESS HEIGHTS

THE FOLLOWING AREAS WILL BE AFFECTED:
PORTION OF WILDERNESS HEIGHTS
DE WAAL DRIVE, HEIGHTS RD, WHITES RD, KOOBOO BERRY, CONSTANTIA DRIVE, NUM NUM CRESCENT, FYNBOS SLOT

NOTICE is hereby given that the electricity supply will be interrupted on WEDNESDAY 01 JUNE 2022 FROM 09H00 TO 16H30 for the purpose of doing alterations to the electrical mains. Consumers are warned to treat the installation as being live for the full duration as the supply may be resumed at any time within the notified period.

Should circumstances prevent the work from being carried out during the abovementioned period; the work will be done on THURSDAY 02 JUNE 2022 FROM 09H00 TO 16H30

Issued by George Mun
30 May 2022

*

BEPLANDE KRAGONDERBREKING: GEDEELTE VAN WILDERNIS-HOOGTE

DIE VOLGENDE AREAS SAL GERAAK WORD:
GEDEELTE VAN WILDERNIS-HOOGTE
DE WAAL LAAN, HOOGTE WEG , WHITES STR, KOOBOO BERRY, CONSTANTIA WEG, NUM NUM SINGEL, FYNBOS SLOT

KENNISGEWING geskied hiermee dat die elektriese toevoer onderbreek sal word op WOENSDAG 01 JUNIE 2022 VANAF 09H00 TOT 16H30 met die doel om veranderings aan elektriese hoofleidings te maak. Klante word gewaarsku om die installasie as lewendig te beskou vir die volle periode aangesien die toevoer enige tyd gedurende die periode aangeskakel mag word.

Sou omstandighede verhoed dat die werk gedoen kan word gedurende bogenoemde periode, sal die werk gedoen word op DONDERDAG 02 JUNIE 2022 VANAF 09H00 TOT 16H30

Uitegereik deur George Mun
30 May 2022

DELAYS IN REFUSE REMOVAL 30 MAY 2022

DELAYS IN REFUSE REMOVAL 30 MAY 2022

Please take note of delays in the below-mentioned areas for today, 30 May 2022. Teams will start a bit later but work will be completed today.

• Wilderness small businesses, housing – Mdlangu –
• George big businesses – Gege
• George small businesses – Ngqavu
• Glen Barry.Heatherlands -housing – Zimemo
• Heather Park, Blanco -housing -Elliot

Issued by George Mun
30 May 2022 @ 13:00

PLANNED POWER OUTAGE: PORTION OF HANSMOESKRAAL

PLANNED POWER OUTAGE: PORTION OF HANSMOESKRAAL

THE FOLLOWING AREAS WILL BE AFFECTED:

PORTION OF HANSMOESKRAAL

BEACH ROAD

NOTICE is hereby given that the electricity supply will be interrupted on  TUESDAY 31 MAY  2022  FROM  09H00 TO 16H30 for the purpose of doing alterations to the electrical mains.  Consumers are warned to treat the installation as being live for the full duration as the supply may be resumed at any time within the notified period.

Should circumstances prevent the work being carried out during the abovementioned period; the work will be done on WEDNESDAY 01 JUNE  2022 FROM  09H00 TO 16H30

Issued by George Mun

27 May 2022

***

BEPLANDE KRAGONDERBREKING: GEDEELTE VAN HANSMOESKRAAL

DIE VOLGENDE AREAS SAL GERAAK WORD:

GEDEELTE  VAN HANSMOESKRAAL

BEACH STRAAT

KENNISGEWING geskied hiermee dat die elektriese toevoer onderbreek sal word op  DINSDAG 31 MEI  2022 VANAF  09H00 TOT 16H30 met  die doel om veranderings aan elektriese hoofleidings te maak.  Klante word gewaarsku om die installasie as lewendig te beskou vir die volle periode aangesien die toevoer enige tyd gedurende die periode aangeskakel mag word.

Sou omstandighede verhoed dat die werk gedoen kan word gedurende bogenoemde periode, sal die werk gedoen word op WOENSDAG 01 JUNIE 2022 VANAF 09H00 TOT 16H30

Uitgereik George Mun

27 Mei 2022

 

 

UPDATE 2: POWER OUTAGE WILDERNESS

UPDATE 2: POWER OUTAGE WILDERNESS

The repairs are complete, however, the Vegetation team will also be attending to trees that are in close proximity to the line. The ETR will therefore no longer be 2 hours, but will be at 14:00 today.

Issued George Municipality
27 May 2022
11:35

UPDATE: POWER OUTAGE WILDERNESS HEIGHTS

UPDATE: POWER OUTAGE WILDERNESS HEIGHTS

Most of the power supply has been restored, only a small portion affecting the fairyknowe hotel, Eden adventures, Nature reserve housing and one other client remain off. Repairs are continuing. ETR 2hours.

Issued by George Mun
27 May 2022
09:35

WATER SUPPLY INTERRUPTION IN ZONE 6, THEMBALETHU

WATER SUPPLY INTERRUPTION IN ZONE 6, THEMBALETHU

The Water Distribution Networks services will be working on the Tabata 1 meter on Monday 30 May 2022 from 09 am till 12 pm.

The affected area will be Zone 6, Thembalethu. A water truck has been arranged to supply drinkable water while works continue.

Issued by George Municipality

26 May 2022

15:40