Skip to content Skip to left sidebar Skip to right sidebar Skip to footer

UPDATE: Kraaibosch Estate/Groenkloof area  27 September 2023 at 17:38

Complications with the pipeline are delaying repair work. The new estimated time of repair is 22h00 tonight.

A water truck is rotating between Kraaibosch Estate and Groenkloof. A second water truck is on its way to support the peak load.

Tankers will be roaming through both areas.