Eskom Load shedding schedule update: 3 September 2023 at 13:45

Stage 5 loadshedding will be implemented at 16:00 today until 05:00 on Monday. Thereafter, Stage 4 loadshedding will be implemented until 16:00. This pattern will continue to be implemented until further notice.

George will be affected as follows:

Sunday 03/09/2023
14:00 – 16:30
22:00 – 00:30

Monday 04/09/2023
06:00 – 08:30
14:00 – 18:30 **
22:00 – 00:30

Tuesday 05/09/2023
04:00 – 06:30
12:00 – 14:30
20:00 – 00:30 **

Wednesday 06/09/2023
04:00 – 06:30
12:00 – 14:30
20:00 – 22:30

Thursday 07/09/2023
04:00 – 06:30
12:00 – 14:30
20:00 – 22:30

Friday 08/09/2023
04:00 – 06:30
12:00 – 14:30
20:00 – 22:30

Uniondale will be affected as follows:

Sunday 03/09/2023
17:00 – 19:30

Monday 04/09/2023
01:00 – 03:30
09:00 – 11:30
17:00 – 21:30 **

Tuesday 05/09/2023
07:00 – 09:30
15:00 – 17:30
23:00 – 03:30 **

Wednesday 06/09/2023
07:00 – 09:30
15:00 – 17:30
23:00 – 01:30

Thursday 07/09/2023
07:00 – 09:30
15:00 – 17:30
23:00 – 01:30

Friday 08/09/2023
07:00 – 09:30
15:00 – 19:30 **
23:00 – 01:30

ROTATIONAL SWITCH ON AFTER LOADSHEDDING – reduce power to avoid network tripping

Consumers are reminded to PLEASE use electricity sparingly after power returns. Please do not switch high-usage equipment on immediately after Load shedding.

Consumers are urged to turn off high-usage equipment and where possible to not switch on appliances such as stoves and kettles for at least 30 minutes after load shedding is scheduled to return. This will reduce the risk of overload tripping on the network.

Reporting power outages
Please do not phone the after-hours number or the Electrotechnical Department to report that you have no power immediately after load shedding is scheduled to be lifted. Please be aware of the rotational switching on i.e. areas are switched on one by one and not all at the same time to avoid overloading the system. Please wait at least 30 minutes before reporting no power. The Electrotechnical Directorate will be aware of a possible substation trip that needs to be sorted out.

Receive Eskom loadshedding notifications by downloading the free EskomSePush app from Google Play Store at https://sepush.co.za/