Eskom Load shedding schedule update 2: 31 August 2023 at 14:01
Stage 4 loadshedding will continue to be implemented daily until 05:00 on Sunday. Thereafter, stage 2 will be implemented until 16:00.
George will be affected as follows:
Thursday 31/08/2023
16:00 – 18:30
Friday 01/09/2023
06:00 – 08:30
14:00 – 16:30
22:00 – 00:30
Saturday 02/09/2023
06:00 – 08:30
14:00 – 16:30
22:00 – 00:30
Sunday 03/09/2023
06:00 – 08:30
Uniondale will be affected as follows:
Thursday 31/08/2023
19:00 – 21:30
Friday 01/09/2023
01:00 – 03:30
09:00 – 11:30
17:00 – 19:30
Saturday 02/09/2023
01:00 – 03:30
09:00 – 11:30
17:00 – 19:30
Sunday 03/09/2023
01:00 – 03:30
09:00 – 11:30
ROTATIONAL SWITCH ON AFTER LOADSHEDDING – reduce power to avoid network tripping
Consumers are reminded to PLEASE use electricity sparingly after power returns. Please do not switch high-usage equipment on immediately after Load shedding.
Consumers are urged to turn off high-usage equipment and where possible to not switch on appliances such as stoves and kettles for at least 30 minutes after load shedding is scheduled to return. This will reduce the risk of overload tripping on the network.
Reporting power outages
Please do not phone the after-hours number or the Electrotechnical Department to report that you have no power immediately after load shedding is scheduled to be lifted. Please be aware of the rotational switching on i.e. areas are switched on one by one and not all at the same time to avoid overloading the system. Please wait at least 30 minutes before reporting no power. The Electrotechnical Directorate will be aware of a possible substation trip that needs to be sorted out.
Receive Eskom loadshedding notifications by downloading the free EskomSePush app from Google Play Store at https://sepush.co.za/