Thu
Thu
Thu
Thu

George

Thursday°C
Thu
Thu
Thu
Thu

Wilderness

Thursday°C
Thu
Thu
Thu
Thu

Uniondale

Thursday°C
Thu
Thu
Thu
Thu

Haarlem

Thursday°C

Important numbers

Electricity044 874 3917
Water / Sanitation044 801 9262/9266
Fire 044 801 6311
Refuse Removal044 802 2900
Traffic / Licence044 878 2400 / 044 801 9315
Law Enforcement044 801 6350
GO GEORGE Call Centre0800 044 044
George Municipality Switchboard044 801 9111
Hide -
Published: 20 Feb 2019Title: George Municipality water update: 20 February 2019Status: GEORGE MUNICIPALITY WATER UPDATE: 20 FEBRUARY 2019;Dam level: 82.43% (up from 81.75%); Rainfall since 14 February 2019: 0mm;Demand/usage: 30.8 megalitres (target 22Ml);Months water left in dam: 9
Published: 13 Feb 2019Title: GEORGE MUNICIPALITY WATER UPDATE: 13 FEBRUARY 2019Status: Dam level: 81.75% (up from 80.92%) Rainfall since 7 February 2019: 26.5mm Demand/usage: 28.23 megalitres (target 22Ml) Months water left in dam: 9 Section 2b restrictions remain in place, including watering times. Fines may apply. Details in News section.
Published: 07 Feb 2019Title: George Municipality Annual Report 2017-18 available for commentsStatus: George Municipality Annual Report 2017-18 available on website under Documents/Annual Report, libraries and area offices from 8 February to 4 March 2019 for comments.
Published: 05 Feb 2019Title: BLUE AND GREEN BAG COLLECTION RECOMMENCESStatus: Collection of blue and green bags recommences Monday 11 February 2019 as per usual refuse collection days. If you have not received your initial, two-of-each bags (1-8 February 2019), please report to Interwaste 044 878 0688. See news section for more details.
Published: 28 Jan 2019Title: Road Upgrades - Merriman StreetStatus: George Municipality has started with road upgrades to Merriman Street from Hibernia Street to Nelson Mandela Boulevard. The construction will be done in sections. Section 1: Nelson Mandela Boulevard to Victoria Street (Right hand side). Residents will be informed of the closures in advance.
5
Home 5Contact usShow

Weather

George
Thursday°C
Thu
Thu
Thu
Thu

Weather

Wilderness
Thursday°C
Thu
Thu
Thu
Thu

Weather

Uniondale
Thursday°C
Thu
Thu
Thu
Thu

Weather

Haarlem
Thursday°C
Thu
Thu
Thu
Thu

Important numbers

Electricity 044 874 3917
Water / Sanitation 044 801 9262/9266
Fire 044 801 6311
Refuse Removal 044 802 2900
Traffic / Licence 044 878 2400 / 044 801 9315
Law Enforcement 044 801 6350
GO GEORGE Call Centre 0800 044 044
George Municipality Switchboard 044 801 9111
26 July 2017

Feed electricity into municipal grid

George Municipality has made it possible for customers to feed excess electricity, generated from Small Scale Embedded Generation (SSEG), back to the municipal electrical grid. SSEG refers to decentralised renewable power generating plants under 1MW located on residential, commercial or industrial sites. SSEG systems are connected to the wiring on the customer’s premises which is in turn connected to, and supplied by, the municipal electrical grid – thus these generators are ‘embedded’ in the municipal electrical grid.

Mr Steyn van der Merwe, Acting Director: Electrotechnical Services, says the municipality wants to create a sustainable George and therefore supports and assist owners embarking on renewable energy projects. However, it is extremely important that all installations are registered at the Municipality and that they comply with norms and standards to ensure the safety of the public as well as staff working on the electrical network.

Solar Photovoltaic panels (PV), normally mounted on the roof of a residential, commercial or industrial building, is one of the possible SSEG plant types that can be owned and operated by private owners from their erven. Other SSEG types are wind turbines, and biomass plants.

Typically, excess energy from PV installations will be generated during the day when the sun is shining, with the customer consuming electricity from the grid in the mornings and evenings. At the end of the month each SSEG customer’s account gets reconciled between energy supplied and energy used, with any credit on the account being reset, keeping the customer a net-consumer of energy. Van der Merwe says consumers will thus not be able to sell back power to the Municipality and generate an income from their installation, but can reduce their monthly electricity bill.

Customers wishing to install Small Scale Embedded Generation (SSEG) at their homes or business and make use of the relevant tariff can contact the Electrotechnical Services Directorate on ??????? to obtain the relevant application forms.

The commissioning and installation documentation must be submitted to Electro-Technical Services Department, and an inspection will be arranged. All installations must be signed off by a Professional Engineer, at the cost of the customer, to ensure that the installation is completed in accordance with the relevant standards and regulations. If the installation meets the set standards and specifications, approval will be granted to connect to the electrical grid and generation can commence.

You may contact Steyn van der Merwe on 044 8019221 or email Louise Botha on Louise@george.org.za for more information.

Last published 26 July 2017